MossRoad
Super Moderator
- Joined
- Aug 31, 2001
- Messages
- 60,229
- Location
- South Bend, Indiana (near)
- Tractor
- Power Trac PT425 2001 Model Year
I would have run 200a service to the meter.
Put a service disconnect under the meter.
Feed a 200 amp sub panel in the house from the disconnect.
Put a 100 amp breaker in that house sub panel to feed the garage.
Put a 100 amp sub panel in the garage off of that feed with its own disconnect.
Bob's your uncle.
Put a service disconnect under the meter.
Feed a 200 amp sub panel in the house from the disconnect.
Put a 100 amp breaker in that house sub panel to feed the garage.
Put a 100 amp sub panel in the garage off of that feed with its own disconnect.
Bob's your uncle.