ovrszd
Epic Contributor
- Joined
- May 27, 2006
- Messages
- 33,499
- Location
- Missouri
- Tractor
- Kubota M9540, Ford 3910FWD, Ford 555A, JD2210
One of my farm boundary fences crosses a deep, narrow ditch. It's always a hassle keeping the watergap intact. Especially this year when we had a couple very large rains in very short time. So I decided I would install a culvert, fill the ditch and fence across it.
I used the FEL and cut off a nearby steep hill for the dirt. Took a lot of trips. I worked on it when I felt like it so it didn't stress me much. Took 3 weeks but now the fence spans the ditch plus I made it wide enough to drive across alongside the fence.
I used the FEL and cut off a nearby steep hill for the dirt. Took a lot of trips. I worked on it when I felt like it so it didn't stress me much. Took 3 weeks but now the fence spans the ditch plus I made it wide enough to drive across alongside the fence.