The way California makes us build schools is to pour the footing to 1" below the bottom plate and then dry pack the space. This will insure full contact. The hard part on a completed structure like your is that someone will have to go under and back up the packing.
The drypack has to be rammed pretty tight to be effective. Usually a 3/4" board and a hammer.
You know Jim, that makes a lot of sense. Really the only way to ensure tight interface between the sill and the top of the concrete.