Another view of where the dirt is coming from. The bank got to be above the height of my 180, so I decided to start my retaining wall, where the rocks are lined up. I plan to build that up about 3 feet, and start digging again.
This is the steepest slope that I mow with the 180. I tried to get the telephone pole in for a reference point. I do believe it is plum. I go up the hill with the mower deck raised and off, then back down with it in float and on.
I have a hill about that steep that i mow by driving straight to the top then reverse back to the bottom. The only thing is it's not near as long. it might get pretty old going up then down, up then down, up then down..... /forums/images/graemlins/wink.gif