Is it ok to bulid a pole building on a grade?It is about a 3 ft drop in the back over a 28 ft length.All of the pole barn builders,four so far, I have talked to insist on a nice level pad before they will build.I am sure it's been done and why couldn't I just close in the bottom later and back fill inside to grade? Wouldn't they just set longer poles in the back and level to the front.Am I missing something here,pls advise.