mx125, if your soil conditions will allow you to use a trencher you could probably do the 2200 feet of electric service trench on a weekend. IF THE SOIL CONDITIONS ALLOW. Are you gluing up the conduit and backfilling the trench. If you are you will need some help. The way I would do it with help is glue up the conduit first. You could actually glue it all up if the terrain permits. Lay the conduit off to one side of where you are going to trench. Out of the way of the trencher. Now start trenching. When you have about 100 feet of trench done have a helper start putting the conduit in the trench working towards the trencher. Once that 100 feet of conduit is in the trench you can start backfilling the trench with your tractor. Provided you have either a loader,rear blade or front blade. Keep trenching ,laying conduit and backfilling. With two other friends things should go pretty smoothly.
Let us know how you make out.
As far as the geothermal of "500 feet per ton" that may be 500 feet of pipe per ton and if they slinky the pipe it doesn't take 500 feet of ditch. $6,000 seems high, but I don't know what the rates are for your area.
Sincerely,Dirt
Let us know how you make out.
As far as the geothermal of "500 feet per ton" that may be 500 feet of pipe per ton and if they slinky the pipe it doesn't take 500 feet of ditch. $6,000 seems high, but I don't know what the rates are for your area.
Sincerely,Dirt