OP
warburtonplayer
Silver Member
- Joined
- Jun 9, 2007
- Messages
- 127
The $30 square foot is from the builder who built my house now. I really want to use him. he othe bids I had some were upwards of $50 an hour? I have a existing building 24x26 enclosed car port with a 12 foot door on in and 2 walk in doors I will be trading the concrete guy for the Slab. All I need to do is pay the $1500 for the concrete. Total $ for the job would have been about $4800 to dig the footers at 3 feet because I have shrink swell soil. That will cut some cost off the top and also I will have the pluming roughed in the building but not hooked up the septic I will do this at a later date. Im tryin to cut as much of the front end of the deal as possible. With me doing the concrete deal the shingles, sidding and the roll up doors I have dropped about $10000 of already so Im sittin around $15000 for the job. Still seams a bit high but I want the job done the right way.