joshuabardwell
Elite Member
I simply open up the ground with a square shovel. Insert about 8" and rock back and forth to open a shallow trench. When done all the way, put cable in and stomp to close the ground back around it. Places the cable at an avg of 6" down or so.. leave a little slack at each end for ground movement.
This is what I do too. It's tedious as all get-out, but it gets the job done.