oosik
Epic Contributor
Around here a 4' x 3/4" hunk of rebar is pounded in to a point at least 6" below ground level for small lots - a red capped wooden stake is set at or near the survey point. Bronze capped steel stakes are used for full, half & quarter corners. Relevant info is stamped on the top of the bronze cap. Rebar & bronze caps can be found later with a metal detector.