It is looking good for me to buy the metal early next week, then the fun will begin. After all the great replies and reading all the post about table here and on WW, I think I have a workable plan in my head... Need to do a bit of drawing this week but here is what I have come up with so far. Please let me know if I have missed something. suggestions welcome.
My table specs, I think
Top: 3/8 thick, 30" x 60". 2 or 2-1/2 inch overhand on all sides
Top: will weld in cross pieces to the frame, Will stitch the top to frame.
Height: 36"
Casters and floor locks. Mount floor locks to outside of leg tube like Big Barn did (TBN)
Thinking about these
floor locks.
Casters 6", cast iron hub with polyurethane tread - these are already on hand
Leg assembly and all cross pieces: 2 x 1/4 square tube
Receiver / stinger: 2-1/2 x 3/16 Sq for receiver, 2 x 3/16 Sq for stinger
2 on each long side, the 2-1/2 tube will be 30"ish long, same tube services both sides of table
1 on each end, the 2-1/2 tube will butt into the long side tube
2 9/16 holes in each receiver end, with 1/2 nuts welded in place on outside
2 quad outlets, one on each end, diagonal, mounted to the left side of each end. long cord...
Grinder rack one both ends, under or near the outlet
2 mig gun holders. Welded to the inside edge of the leg, right side as looking at long side
Bottom shelf: Expanded metal with 3-ish cross braces of 2 x1/4 square tube
What will live on bottom shelf: abrasive chop, cut offs, vise
Clamp rack: each end with the grinder holder
What have I missed? Thanks!