katyhorn
Member
Ive been reading posts about this in this forum about this. one mentions splicing two 2x12s 16 ft long together but does not go into the details of how the spkicing is done. can anyone help here? thanks!
Wow... that was a project! Following along here. I love bridge building stuff and have a structural engineering degree... just no practical experience.How long of a span do you need? We built ours years ago with old train trestle timbers and I think our span was about 40 to 50 feet.
Wow... that was a project! Following along here. I love bridge building stuff and have a structural engineering degree... just no practical experience.
katyhorn - good evening and welcome to TBN. Be very careful with your design. Notice the pics you posted show NO TRACTOR on that bridge. Also this is a clear span bridge - meaning, no center pier to carry the load. I would strongly suggest a review of your design by a knowledgable civil engineer acquainted with bridge design.