Dump Trailer to haul rk24

   / Dump Trailer to haul rk24 #11  
This is exactly what I was looking for. What model trailer and how high are the sides?
it's 6' wide 12' long 18" sides
I got it through Tractor Supply Company, did not realize it was going to come with ramps and tie downs, it was a nice surprise
6X12DUMPLP1K –
 
   / Dump Trailer to haul rk24 #13  
I can understand doing it in a pinch, but why would you want to haul your tractor like this? I don’t think the backhoe needs a strap if it has pins to secure it sideways and up or down.
 
   / Dump Trailer to haul rk24 #16  
OP asked about a trailer to haul a 24. RK sells one for that.

If OP also wants a trailer to do other things, then they can spend that 3 times (or more) higher money.
 
   / Dump Trailer to haul rk24
  • Thread Starter
#17  
I can understand doing it in a pinch, but why would you want to haul your tractor like this? I don’t think the backhoe needs a strap if it has pins to secure it sideways and up or down.
I would like to be able to haul my tractor to a site, load the dump trailer with fill, deliver load, repeat.

I don’t have a trailer that will haul my rk24 and I want a dump trailer. So why not get a trailer that will do both.
 
   / Dump Trailer to haul rk24 #18  
I would like to be able to haul my tractor to a site, load the dump trailer with fill, deliver load, repeat.

I don’t have a trailer that will haul my rk24 and I want a dump trailer. So why not get a trailer that will do both.

I meant wanting a trailer that’s the absolute minimum size to fit they required overhanging both ends.
 
   / Dump Trailer to haul rk24 #19  
I meant wanting a trailer that痴 the absolute minimum size to fit they required overhanging both ends.

I was not fast enough with the phone today,, but, we saw a 53 foot trailer hauling 80 foot wood power poles today,,
he did not seem to have an issue with overhang

It did take him close to 15 minutes to make a 90 degree turn at a traffic light. There was a LOT of traffic backed up,,, :confused2:
 
   / Dump Trailer to haul rk24 #20  
I was not fast enough with the phone today,, but, we saw a 53 foot trailer hauling 80 foot wood power poles today,,
he did not seem to have an issue with overhang

It did take him close to 15 minutes to make a 90 degree turn at a traffic light. There was a LOT of traffic backed up,,, :confused2:

Tailswing with that load would be a real problem. The point is why but a trailer that you already know is pretty much too short?
 

Tractor & Equipment Auctions

1998 VOLVO A40 OFFROAD DUMP TRUCK (A51242)
1998 VOLVO A40...
John Deere 1100 3 pt Field Cultivator (A50514)
John Deere 1100 3...
PALLET OF (2) THERMOKING TRIPAC UNITS (A50854)
PALLET OF (2)...
2025 Kivel 48in Forks and Frame Skid Steer Attachment (A50322)
2025 Kivel 48in...
2020 CHEVROLET Z71 TEXAS EDITION TRUCK (A51406)
2020 CHEVROLET Z71...
LIGHT BAR AND WIRING (A50854)
LIGHT BAR AND...
 
Top