Working rail roads and their tracks.

   / Working rail roads and their tracks.
  • Thread Starter
#2,112  
More RR pics from this week. I'd guess the rims were cast on February, 12th in 1918 at a foundry in Chicago IL called Griffin. They are a narrow gauge RR and the Q M C stand's for Quincy Mining Company. Looks like Griffin is still in production.
P1130086.jpg
P1130082.jpg
P1130085.jpg
P1130087.jpg
 
   / Working rail roads and their tracks. #2,114  
Looks to me like the water tank is a little far away from the track. Has one of them been moved or modified?
 
   / Working rail roads and their tracks. #2,118  
   / Working rail roads and their tracks. #2,119  
Looks to me like the water tank is a little far away from the track. Has one of them been moved or modified?

My guess is the building was restored and moved onto new piling/cribbing, or the original snout rusted and a new replica was installed thats shorter.
 

Tractor & Equipment Auctions

2016 FREIGHTLINER  CASCADIA (INOPERABLE) (A53843)
2016 FREIGHTLINER...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
DROME EXCAVATOR SLIDE ATTEHMENT (A50322)
DROME EXCAVATOR...
2017 FREIGHTLINER CASCADIA SINGLE AXLE DAY CAB (A54607)
2017 FREIGHTLINER...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
 
Top