Were it my sHed, First I would tear out the floor. Dig down 4 places for a jack, jack it up and pour or have someone pour what we call a floating slab under it. 8" thick concrete with some rebar in it, Let it float with the frost. Otherwise, need to move the shed to the new floor on the...