Recent content by Ocean2026

  1. O

    Leveling part of a hill iwith a 25% Slope- see atttachments

    I have some great pics already . The upper part has the best views, if this doesnt upload sfischerlaw@gmail.com and I will send Rick I basically want to somewhat level am acre mabe 60,000 square feet - would that not be doable in a solid week 7 days of work? [
  2. O

    Leveling part of a hill iwith a 25% Slope- see atttachments

    There's a hill that ascends 850 feet in height- But see attached. want to level the first 500 feet which starts from 200 ft above sea level and goes to 360 ft above sea level. The land is in Skaokawa WA and one can see the Columbia River - Vista Park at the bottom. The entire hill -...
  3. O

    Dozer size for remmoving 5' diameter stumps and hill leveling

    HI its been years since I used a dozer - enjoyed it however. I need to flatten a hill and remove some old Douglas Fir stumps. I can rent a Deere 450 or 650 or a D4 - I never removed big stumps but the trees were cut 3-4 years ago in rainy Western Washington and they might not be as tough...
  4. O

    Building a smlll 100' pond in a rainy area

    These are timberlands in SW Washington 55"of rain annually 10" each Dec Jan Feb--sandy loam soil I would like a pond that would attract wildlife (not to shoot them) ducks deer etc. I would love it if all that rain could be diverted -used to refresh the pond.. The pond doesn't have...
  5. O

    Building a road on a mountain slope

    Can a gravel road be built to run 1350 ft starting at 200ft altitude -elevation and ending at 700ft up? What about a walking path? This is approximately a 37% slope.. the tract is about 300ft wide.. The ground is forest land Washington State (just North or Oregon). If it was doable...
Top