Search results

Results 1 to 2 of 2
  1. C

    Mini equipment pit

    I took four (6’ x 18” x18”) waste concrete blocks, on a level dirt surface, placed them two end to end and parallel about 6’ apart. Made a dirt ramp on one end allowing most vehicles , tractors, etc to be driven up onto the parallel blocks. Care must be taken to center tracks/tires on parallel...
  2. C

    Hi and then some

    I have worked by L48 over the past ten years (2512 hrs) to supply logs for my band saw mill, pour concrete (hydraulic mixer for the loader to scoop up sand and gravel then add two bags of portland, mix well and pour), lift (fork lift crane with a 12 volt winch with remote) metal roof panels up...
Top