I am wanting to build a 20x40 concrete pad 4" with a metal roof only, no sides. What kind of foooting do I need around the peremiter? 12"X12", 18"x18"?
I am in east Texas so no frost/freeze. Does anyone here know?
Thanks,
Rick
I am working on a 2 7/8" pipe fence across the front of our property. As you can see from the pictures there is a curve in the road. Is this possible to do a slow curve. It is over about 110'. The tape measure shows where I would like to curve it. Any feed back would be appreciated.
Thanks,
Rick
Well here is my first attempt at a pipe fence. To keep my wifes dog at home and the neighborhoods dogs out.
2 7/8" new pipe, 12" by 3' holes, 4 bags of crete per hole, like Harv says. This is the first section of my journey. This first line is 400', it has a little roll to it, down then back...