1/3 of the concrete is down

   / 1/3 of the concrete is down #1  

mlinnane

Silver Member
Joined
Oct 18, 2005
Messages
103
Location
Esperance, NY
Tractor
mf 165
We poured the 30 X 40 saturday. I have a guy who does sidewalks for a living do the pour with two other guys. There was 20 yards of concrete. With the truck time and the fiberglass mess the concrete was $1861 I am in the north east. I just got the radiant heat in before the pour. We did 4 300 foot runs in the 30 X 40 1/2. I also radaint barrier down plus I did not want to take any chances I also laid down 1 inch of foam insultation. I also kept the tubes under about 28 lbs of pressure duing the pour.
I am not starting to get the 28 X 90 prepared for concrete I tacked the radiaint barrier about 6 to 7 inches above the. Then for all the doors I stuff fiberglass under the door sills and laying 1 inch insulation down and then the wire mess. Then we need to lay 8 300 foot runs in the 28 X 90.
God materials are so expensive. I will try and get some photos tonight.
 
   / 1/3 of the concrete is down #2  
Congratulations!! Once you got the foundation in place, the rest is easy!!!

Eddie
 
   / 1/3 of the concrete is down #3  
Yes they are.It would probably be a good rule of thumb to figure an additional 30% for materials over and above your original estimate to be safe.Am I about right Eddie?.
 
   / 1/3 of the concrete is down
  • Thread Starter
#4  
I am taking a belt and suspender approach for my insulation. I am using the radiant barrier and 1 inch of insulation. I going to go with R21 in the walls and I hope to get R44 in the ceiling. So hopefully this building will be easy to heat. Here is the materials list and bill so people can get an idea of how
much everything costs. This is minus the 1200sq feet I have already laid.
The next two pours will be 1260 sq feet each.

Ord Qt Shp Qt BO Date Product Description Net Prc Ext Prc

16ea 16ea ******** A5500500 1.092 17.47
WIRSBO 1/2 GRAY PVC BEND SUPPORT
8ea 8ea 09/03/06 F1060500 92.400 739.20
WIRSBO AQUAPEX 1/2X300FT TUBING
8ea 8ea ******** Q4775050 0.858 6.86
PROPEX 1/2 PXP PLS COUPLING
3ea 3ea ******** Q4350500 0.520 1.56
PROPEX 1/2 PLS PLUG
6ea 6ea 08/27/06 Q2500400 66.924 401.54
PROPEX 1X1/2 4LOOP MANIFOLD WV
3ea 3ea ******** UPS1558FC 63.938 191.81
GRUNDFOS 3 SPEED CIRC W/ FLOW CHECK
3ea 3ea ******** 50403 12.250 36.75
3/4" CXC "ISOLATOR" BALL VALVE FLG
3ea 3ea ******** 34CCBVFLGWP 14.780 44.34
WATTS 3/4" CXC PUMP FLG W/PURGE
0067793
*** Above not returnable ini ___ **
1ea 1ea ******** ST12 60.736 60.74
AMTROL ST12 POTABLE EXP TANK
3ea 3ea ******** PSP511L 40.000 120.00
LUX PROGRAMABLE THERMOSTA W/LIGHT
1ea 1ea ******** 904176 53.580 53.58
TAPPAN (NEW) 3" CONCENTRIC VENT KIT
3ea 3ea ******** 1CMAD 3.952 11.86
1 CXM ADAPT
2ea 2ea ******** 1CFAD 5.069 10.14
1 CXF ADAPT
1ea 1ea ******** VRTX100 59.318 59.32
TACO VORTECH 1 AIR ELIMINATOR
1ea 1ea ******** ST12 60.736 60.74
AMTROL ST12 POTABLE EXP TANK
1ea 1ea ******** SB1156F 40.470 40.47
WATTS BRONZE BOILER FEED
1ea 1ea ******** 12BRTEE 3.466 3.47
1/2 BRASS TEE
2ea 2ea ******** 12X4BRN 4.237 8.47
1/2X4 BRASS NIPPLE



Here is the boiler that they are figuring on
Ord Qt Shp Qt BO Date Product Description Net Prc Ext Prc
20ea 20ea ******** 1L20 5.516 110.32
FT 1 L COPPER TUBING-20S
6ea 6ea ******** 1CC90 2.400 14.40
1 CXC 90 ELBOW
Invoice Amount 2152.48
PRESTIGE SOLO 110 PROPANE FIRED
CONDENSING WALL MOUNTED MODULATING
BOILER WITH 93% AFUE.
Invoice Amount 2974.91
 

Tractor & Equipment Auctions

2014 PETERBILT 386(INOPERABLE) (A52472)
2014 PETERBILT...
2015 John Deere Z950M 70in Zero Turn Mower (A51691)
2015 John Deere...
NEW Wolverine 72'' Skid Steer Sickle Bar Mower (A53002)
NEW Wolverine 72''...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
PICKUP TOOLBOX (A52472)
PICKUP TOOLBOX...
2018 Gatormade 20+5 Gooseneck Trailer (A52748)
2018 Gatormade...
 
Top