scarg
Bronze Member
Has anyone else discovered this?
To get a full load of dirt/gravel i drive up to the face of the material (dirt) with the 4 in 1 bucket open fully and basically horizontal. I then drive up the face of the gravel pit and drop the bucket and drag the dirt down. After that I close the bucket to "standard" position like a normal bucket and curl it at the same time. By doing this you can get a completely full bucket in one shot without beating the **** out of the PT and it is a lot quicker.
I am sure that others have done this but it may help someone out that hasn't done this method yet.
Any other unique implement tips would be interesting to hear about.
Thanks,
Steve
To get a full load of dirt/gravel i drive up to the face of the material (dirt) with the 4 in 1 bucket open fully and basically horizontal. I then drive up the face of the gravel pit and drop the bucket and drag the dirt down. After that I close the bucket to "standard" position like a normal bucket and curl it at the same time. By doing this you can get a completely full bucket in one shot without beating the **** out of the PT and it is a lot quicker.
I am sure that others have done this but it may help someone out that hasn't done this method yet.
Any other unique implement tips would be interesting to hear about.
Thanks,
Steve