The land is pretty much flat, all sandy with some organic soil underneath. There is no good drainage ditch or creek. How do I create a low spot from flat land? I haven't thought about life span. Greater than 10 years would be nice. Thanks.
By the way, the article has a photo of some huge machine digging and laying drainage pipe. Is this expensive?