So this one is a bit more complex....
I plan on making some LED lit scultpures along our driveway. Could be real cool or a real failure.
At the end I could potentially be 700 feet from a power source.
The sculpture will be wrapped in LED Bulbs, Lets say 50 ft of ribbon (No Clue Estimate) The ribbon consumes on the high end 1 watt per foot, so each sculpture is 50 watts.
Now comes the tough part that is beyond my scope. The power supplies are rated from 85 volts to 240V.
I could do the following. Run 110 down the hill, knowing full well I am loosing power as i go, I could Run 220, which seems to have provide me a bit more amperage for the same wire width, or I could attach DC with high amperage to power the line.
The line, I don't want this project to spin out financially. 700 Feet of direct bury 10 guage at a buck a foot is painful. There is 250ft of 12-2 DB Low Volatage that is $80 a spool.
Anyway, just don't know enough on length runs to figure out how best to do this. I am thinking 6 sculpture max. And it may be on 2 seperate lines. (left and right side of road)
I plan on making some LED lit scultpures along our driveway. Could be real cool or a real failure.
At the end I could potentially be 700 feet from a power source.
The sculpture will be wrapped in LED Bulbs, Lets say 50 ft of ribbon (No Clue Estimate) The ribbon consumes on the high end 1 watt per foot, so each sculpture is 50 watts.
Now comes the tough part that is beyond my scope. The power supplies are rated from 85 volts to 240V.
I could do the following. Run 110 down the hill, knowing full well I am loosing power as i go, I could Run 220, which seems to have provide me a bit more amperage for the same wire width, or I could attach DC with high amperage to power the line.
The line, I don't want this project to spin out financially. 700 Feet of direct bury 10 guage at a buck a foot is painful. There is 250ft of 12-2 DB Low Volatage that is $80 a spool.
Anyway, just don't know enough on length runs to figure out how best to do this. I am thinking 6 sculpture max. And it may be on 2 seperate lines. (left and right side of road)