I am putting a 160ft driveway in and need some advice. Ill start with some infoabout the land. The land was an farm field that has been chopped and disc'd up. Okay For my questions 1) If you where putting in a drive way what would you start with equipment wise? 2) Does teeth on a bucket help that much? 3) would a box blade work if you scarped away the first few inches of disced up soil?
This is what I did I rented a bobcat scraped away first few inches and piled it up. This bobcat does not have any teeth on the bucket so when I tried to start digging well, it was very hard to dig to desired depth which is 9-12 inches. I did take a few layers off but took all day and I am still not done. So I thought maybe if I rented a tractor and a box blade that might dig down for me then come back along with a fel and clean it up. Has anyone ever tried this? I need some advice so please chime in with any ideas. Thanks Bryan
This is what I did I rented a bobcat scraped away first few inches and piled it up. This bobcat does not have any teeth on the bucket so when I tried to start digging well, it was very hard to dig to desired depth which is 9-12 inches. I did take a few layers off but took all day and I am still not done. So I thought maybe if I rented a tractor and a box blade that might dig down for me then come back along with a fel and clean it up. Has anyone ever tried this? I need some advice so please chime in with any ideas. Thanks Bryan