Dug out around it about 3' deep with the BH and sort of ramped on the front, then held it up with the fel and pulled it out in reverse wtih a chain tied to the frame. It's about 3' X 3' X 4' and except for the 2 - 2" pieces of pipe, it's solid concrete.