After reading about the utility of box blades in this forum, I bought a heavy duty 6ft BB to repair the run off damage to my woods roads caused by the recent nor'easter in NJ. Without bringing in fill from some where, it appears that filling the gulleys caused by the run off will involve dragging the road and filling with the dragged soil. This has the over all effect of lowering the road bed createing banks on either side. I assume that I will have to create some camber in the road to direct future water flow. Widening and creating a proper ditch is impractcal due to the adjacent trees.
It is not obvious to me how to put in the camber with the box scrapper. I welcome your suggestions.
It is not obvious to me how to put in the camber with the box scrapper. I welcome your suggestions.