I am finally starting the footers on my log cabin on the mountain top. The building inspector red tagged the work because there was no ground wire connected to the steel rebar. He wants about 18-20' of #4 copper wire connected to the rebar and left laying next to the footers. This wire will eventually connect to the meter box on the first floor exterior wall. There is going to be a full basement. The wire is supposed to run from the rebar up the basement wall buried in dirt and then connect to the meter. This will be in addition to the standard 8' long 5/8" grounding rod required by the electrical inspector.
I am confused. The rebar will be buried in the middle of the footers which are 24" wide and 12" deep. Theoretically, the rebar will never touch the earth, only the concrete surrounding it. What purpose does connecting the meter box to the rebar serve?? Is this normal in other parts of the country??
I am confused. The rebar will be buried in the middle of the footers which are 24" wide and 12" deep. Theoretically, the rebar will never touch the earth, only the concrete surrounding it. What purpose does connecting the meter box to the rebar serve?? Is this normal in other parts of the country??