calculating cost of down time...

   / calculating cost of down time... #1  

TMTS

Silver Member
Joined
Nov 17, 2007
Messages
110
Location
New Hampshire
Tractor
ASV 4810, JD 540 skidder, Barko loader
After spending most of today changing one track and then replacing the bearings for my front wheels on the other track, I had a question...

how do you calculate the cost of down time? I know my daily fixed cost for equipment payments, insurance, etc...then the cost of parts and repairs but how do you factor is the lost production? Look at profit per hour x 8 hrs.?

just trying to get a handle on down time...

thanks-

TMTS
 
   / calculating cost of down time... #2  
Yes, normal profit * 8 hours. Plus repair costs outside of normal maintenance.

You may have to add extra costs if you have any time based contracts and have to rent equipment to keep on schedule.
 

Tractor & Equipment Auctions

2023 BOBCAT T62 COMPACT SKID STEER TRACK LOADER (A55218)
2023 BOBCAT T62...
2011 GALYEAN 130BBL VACUUM TRAILER (A53843)
2011 GALYEAN...
1274 (A50490)
1274 (A50490)
John Deere Gator XUV560S4 4x4 Utility Cart (A50324)
John Deere Gator...
2005 V.E. ENTERISES 130 BBL STEEL VACUUM TRAILER (A53843)
2005 V.E...
2015 Ford E-350 Cutaway Van (A52377)
2015 Ford E-350...
 
Top