calculating cost of down time...

   / calculating cost of down time... #1  

TMTS

Silver Member
Joined
Nov 17, 2007
Messages
110
Location
New Hampshire
Tractor
ASV 4810, JD 540 skidder, Barko loader
After spending most of today changing one track and then replacing the bearings for my front wheels on the other track, I had a question...

how do you calculate the cost of down time? I know my daily fixed cost for equipment payments, insurance, etc...then the cost of parts and repairs but how do you factor is the lost production? Look at profit per hour x 8 hrs.?

just trying to get a handle on down time...

thanks-

TMTS
 
   / calculating cost of down time... #2  
Yes, normal profit * 8 hours. Plus repair costs outside of normal maintenance.

You may have to add extra costs if you have any time based contracts and have to rent equipment to keep on schedule.
 

Tractor & Equipment Auctions

Set 4- 10-16.5 tires/wheel for bobcat (A53421)
Set 4- 10-16.5...
2015 ISUZU NPR 16FT BOX TRUCK (A54313)
2015 ISUZU NPR...
2004 FREIGHTLINER FL70 FLATBED W/TANK & DITCH WITCH MIXER (A53843)
2004 FREIGHTLINER...
2015 JLG Triple-L Flatbed T/A Trailer (A50324)
2015 JLG Triple-L...
2001 KINCAID PRO-SERIES 1200V2 HYDRO SEEDER (A51406)
2001 KINCAID...
2021 International HV507 4x4 12ft Single Axle Dump Truck (A51692)
2021 International...
 
Top