Dam removal time lapse video

   / Dam removal time lapse video #1  

bcp

Super Star Member
Joined
Jul 8, 2009
Messages
14,852
Location
SW WA
Tractor
Kubota BX2360

From the article:

"Removing the old dam was no small job. According to Pete Barber, restoration ecologist for the Cowlitz Indian Tribe, removing 20,000 cubic yards of materials that made up the 425-foot-long, 55-foot-tall dam required planning and coordination. Barber said it was one of the largest dam-removal projects in the state’s history."


Bruce
 
Last edited:

Marketplace Items

2012 Great Dane 53' Trailer (A59230)
2012 Great Dane...
2010 BENSON/WABASH ALUMINIUM FLATBED (A59905)
2010 BENSON/WABASH...
Dual Rear Wheel Axle (A59230)
Dual Rear Wheel...
2024 CATERPILLAR 306CR EXCAVATOR (A60429)
2024 CATERPILLAR...
WHIRLPOOL REFRIGERATOR/FREEZER W/ICEMAKER (A60432)
WHIRLPOOL...
2013 Freightliner Bucket Truck (A55973)
2013 Freightliner...
 
Top