dknarnd
Gold Member
My kitchen project is in the third quarter finally, I'm ready to install trim and have couple of questions. What is the difference between Brads and Finish nails and where/why would you use one over the other?
My other issue is that the run on one leg of cabinets across the top is about 8' 2" and the molding only comes in 8' length so I will have a seam somewhere. The molding is three pieces that will be stacked to give the final look which will bridge the 5" gap between my cabinet top and the ceiling. What type of cut do I use to butt this seam together. One end of the molding is a square cut against the wall, do I put a 2" piece there? Since this is three pieces stacked together should the seam be staggered instead of all of them lined up?
My other issue is that the run on one leg of cabinets across the top is about 8' 2" and the molding only comes in 8' length so I will have a seam somewhere. The molding is three pieces that will be stacked to give the final look which will bridge the 5" gap between my cabinet top and the ceiling. What type of cut do I use to butt this seam together. One end of the molding is a square cut against the wall, do I put a 2" piece there? Since this is three pieces stacked together should the seam be staggered instead of all of them lined up?