   / dirt work 5075m #11  
I am sure it varies by locale but in my area engineered fill runs about $8/yd. Might wan't to ask your concrete guy what works best in your area. I would go with a maximum of 6" lifts, when building my pad which was almost 5' on one corner I went with closer to 3" lifts and used a vibratory roller pictured below. I also built a retaining wall for this pad since it was so high that is not pictured.
 

Attachments

  • shop pad 003.jpg
    shop pad 003.jpg
    433.6 KB · Views: 139
  • shop pad 001.jpg
    shop pad 001.jpg
    544.6 KB · Views: 143
   / dirt work 5075m #12  
150yds isn't that much given the right equipment. A good heavy box blade would be very helpful.

I moved about 500yds when I was building my 40x60 shop, but I had several feet difference from one side to the other. I think it took me about 20hrs with my skid steer, including stripping and piling all the topsoil, compacting and finish grading. I used 3-4" lifts and compacted with the skid steer with a full bucket between each. I've also let it settle for a few months before pouring concrete. As others suggested, you'll want to remove all sod and any soft top soil.
 

Tractor & Equipment Auctions

2019 INTERNATIONAL LT625 TANDEM AXLE SLEEPER (A52577)
2019 INTERNATIONAL...
2016 Chevrolet Malibu Sedan (A51694)
2016 Chevrolet...
2015 Yale MPB040-EN24T2748 4,000lbs Electric Walk-Behind Pallet Jack (A51691)
2015 Yale...
UNUSED Clear Corrugated Polycarbonate Roof Panel (A53117)
UNUSED Clear...
2006 iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A51694)
2006 iDrive...
2015 Freightliner M2 106 Terex BT2047 10-Ton Crane Truck (A51691)
2015 Freightliner...
 
Top