The majority of my trails were made by a dozer I hired in. One day of work usually made a mile or so of trails. I did this once a year; four times so far. The terrain was really rough and a dozer was the only way. Plenty of work left for me after the dozer left. I only had him make a trail through, not finish off the road real nice. He was able to get farther this way.
I did make a few of my own trails, but I did it with the FEL and bush hog. To many small stumps and roots for me to box blade it.
Moon of Ohio