I bought an old place and am thinking about an electrical service upgrade. The transformer is on a pole about 150 feet from an old pole that has the meter. From the meter are old overhead wires to the old house.

I was thinking about a new meter base on the transformer pole and prepare for service to the house, to a well, and to a barn. The well and barn are not there now. Can the meter be put on the transformer pole? How should the setup at the meter be designed so I can make the house connection now and the well and barn connections later. The well and barn would be underground wire but I may keep the house on overhead. The house may be torn down later but for now it's good enough for roughin' it.
 
   / Electrical Question #2  
Believe you will have to ask your local code people or even the local utility people on some of this. Here don't think legal to put any of your owned on the utility company's poles so that would be no. Here the meter and service on a free standing pole is limited to mobile home or temporary service for building or such.
 
   / Electrical Question #3  
This is the type of question that should be answered by a professional. Rules are different from region to region and the stakes are just too high to not get it right.
Mike
 
   / Electrical Question #4  
I'm going to have to agree with the other fellows. I can tell you that my transformer and meter base are on the same pole along with my 200 amp disconnect under that. Sounds like your setup might be after thought or upgrade situation. I'd call the utility co. like before mentioned.

Jay
 
   / Electrical Question
  • Thread Starter
#5  
Let me narrow the question some. After I figure out if the meter base can go on the transformer pole, what should I be thinking about after the meter so I can run service to three destinations--home, well, and barn? Again, the well and barn aren't completed yet. Should I put three disconnects on my side of the meter? If so, should I have an electrical contractor put everything in a single panel? I want to have a well thought out result.
 
   / Electrical Question #6  
As stated in previous reply's, what you "can do" is up to your local utility company. I would contact them and ask if they would send an Engineer out to meet with you and your electrical contractor. Some of your options may be installing a meter/load center combination on their pole, your pole, or your house. Then you would distribute power to the well and barn from it in the future. I would suggest going underground with the power from the utility pole if allowed. In the future you could feed the well and barn underground as well.
 
   / Electrical Question #7  
Again I am in Illinois. I have seen a setup where you put in two short poles and connect them. They put a meter base and connect it to a disconnect / breaker box that you can take as many outlets as you need. I have a setup like that on the end of my house that feeds the house and out building. I also backfeed my generator from the barn into the house when the power goes down.
 
   / Electrical Question #8  
Generally anything you do after the meter as long as it is up to code is your business, the power company could care less, I would think if I understand what you are wanting to you would be better off to have the power company run you a service either overhead or underground your choice to a meter pole or meter pedestal and from there bury a pedestal ie underground box with the feed from the bottom side of the meter coming to said underground box from there you can feed out of pedestal connectors ie multiple tap connectors to sub panels ie house,barn and from house or barn panel to well etc. Generally the power company will drop you an overhead service for free, underground some utilities will charge you a fee depending on the distance, this is by no means the only way to do what you want to do, just one suggestion of many on how it could be done. Hope this helps, good luck.
 
   / Electrical Question
  • Thread Starter
#9  
Lineman, this helps. Can you explain a little more (to someone who doesn't know much) what's in an underground pedestal and what are pedestal connectors? Do I put service disconnects in the underground pedestal? Why would I bury the pedestal as opposed to being above ground and then running the wire underground to the destinations? Thanks again.
 
   / Electrical Question #10  
Lineman, this helps. Can you explain a little more (to someone who doesn't know much) what's in an underground pedestal and what are pedestal connectors? Do I put service disconnects in the underground pedestal? Why would I bury the pedestal as opposed to being above ground and then running the wire underground to the destinations? Thanks again.
A UG pedestal is nothing more than fiberglass box with a fiber/concrete lid usually 2'x3' that you make service connections in, it is hollow and is buried flush with the ground level, the ped connectors are insulated multi-tap connectors meaning the feed from your meter comes in and depending on how many services you want to feed out ie house, barn etc, feed out of those connectors, you can get as many as 8 hole connectors meaning you could feed out to 8 different locations, not that you would want that many in your case, probably 4-hole would be plenty, you could have your main disconnect at your meter pole and from your pedestal connectors your house service would branch off to your house to lets say a 200 amp panel, from the same pedestal connectors your barn service would branch off to your barn to lets say a 150 amp panel and you could feed your well from whichever panel is the closest to it. You dont have to use a pedestal like you said you could just go underground from your meter pole, but every service has to have a pipe coming above ground and up and you have to have room to make up all those wires and a 2'x3' pedestal is easy to work in and everything is out of sight, think of it as a trough like you see on the side of a lot of commercial buildings where their electrical leaves the meter and has to feed several different panels except yours will all be hid underground ie nice neat job, all of the items mentioned can be purchased at an electrical supply house,one other good thing about doing it this way is there is only one meter to read, most utility companies charge a fee to read each meter on your property, around here about 10 dollars per meter. Like I said earlier this is by no means the only way of accomplishing what you want, it's just the way that I would do it, one of many ideas to meet an end goal.
 

Tractor & Equipment Auctions

Big Foot 3pt Plastic Baler (A47307)
Big Foot 3pt...
2008 Audi A4 Sedan (A46684)
2008 Audi A4 Sedan...
2003 Hummer H2 4x4 SUV (A46684)
2003 Hummer H2 4x4...
Master MGH8500IE 8,500-Watt Generator  Electric Start, 18HP Honda Engine (A48561)
Master MGH8500IE...
2019 Ford F350 DRW XL CC Crew Cab 4x4 9' Enclosed Service Body (A45336)
2019 Ford F350 DRW...
2024 AmeriTrail T/A Cool Down Trailer (A45336)
2024 AmeriTrail...
 
Top