yooper1
Veteran Member
Well...I have to be honest and say that the construction company leveled most of the piles for me, but I have 30 hours in doing some fine tuning of sorts. (it's not perfect and there are maybe thousands of rocks to pick up in the spring)
I left about 4 piles there so I could do more after the winter snows go away and things settle.
Here are some before and after photos
From the street / gate:
Before:
After:
A bit to the left (north) as you enter the gate:
Before:
After:
Trail through the wood to Dad's house that he uses / used while the road by his place was tore up:
Trail before (to the North):
Trail after (to the North):
Trail before (looking to the South):
Trail after (looking South):
Looking west while inside the gate:
Before:
After:
And the best thing is the level area I gained.
Satellite image (hi-lited by me for clarity)
My lot hi-lited in orange:
My lot prior to any work showing the usuable level area in red:
My lot after the piles have been leveled and the increased usable level area in yellow:
I left about 4 piles there so I could do more after the winter snows go away and things settle.
Here are some before and after photos
From the street / gate:
Before:

After:

A bit to the left (north) as you enter the gate:
Before:

After:

Trail through the wood to Dad's house that he uses / used while the road by his place was tore up:
Trail before (to the North):

Trail after (to the North):

Trail before (looking to the South):

Trail after (looking South):

Looking west while inside the gate:
Before:

After:

And the best thing is the level area I gained.
Satellite image (hi-lited by me for clarity)
My lot hi-lited in orange:

My lot prior to any work showing the usuable level area in red:

My lot after the piles have been leveled and the increased usable level area in yellow:
