Just bought a gehl 1500 baler with manual tie. The tie system is there but no rope or pulleys. Would like to see a picture if anyone had one of the routing. Not sure what other parts are missing. Thanks for the help.
Some just had tubes to run the string through. You will need to get some RBT and route the baler. You should be able to follow the twine boxes to the tie arms pretty easily