I just had a contractor put a new 1100 ft by 12 ft wide driveway in for me. I had a contract that called for removal of 5-6 inches of top soil, lay down 12.5 ft wide drivway fabric, then top with 5-6 inches of modified, some call it crusher run or quarry run. I am not at the site, but was called by the contractor to say the job was finished. I will be going to the property next weekend, when he will want final payment. By that time, the driveway will have been rained and even snowed on several times. The contractor does not have the equipment to roll or otherwise compact the modified (except by driving on it). Other then the contractor, no one has driven on the driveway. My question is: if I dig small holes down through the modified to the fabric, how much settling should have occured to the modified and what depth should I be expecting? Should I still expect the 5-6 inches specified in the contract?