How to ground my metal building.

   / How to ground my metal building. #21  
the panel in the shop has to have a main breaker, at least to meet code. i have no idea if your getting inspections.

the only way we get by not having a main breaker is if its a subpanel WITHIN the same structure. so a shop or outbuilding doesnt count.
 

Tractor & Equipment Auctions

2004 Ford F250 (A50515)
2004 Ford F250...
2004 INTERNATIONAL 4300 BOX TRUCK (A51222)
2004 INTERNATIONAL...
GROVE RT 63S HEAVY DUTY HYDRAULIC CRANE (A50854)
GROVE RT 63S HEAVY...
GENERATOR HOUSE POEWERED BY TWIN 550HP (60 SERIES)  DETROIT 14.0L ENGINES (A50854)
GENERATOR HOUSE...
2020 FREIGHTLINER CASCADIA SLEEPER (A51222)
2020 FREIGHTLINER...
RoGator RG1100C (A51039)
RoGator RG1100C...
 
Top