Haoleguy
Platinum Member
Recently I had used an excavator to make a tile trench and tried to keep the depth at 5 ft as it went down a gentle hillside until I tapered it to surface level at a low point. My question is what guide do you use to: (a) ensure you are at specified depth and (b) are making a gradual decline for drainage? For (a) I tied pink surveyor tape at 5ft from bottom of level bucket up to a point on the stick when stick was perpendicular to ground...I checked the trench depth this was as I went along. And, for (b) I eyeballed it. What have you tried? Thanks, Gary