Syncro
Platinum Member
I'm going to run about 500' of driveway over some pretty wet ground and am thinking about using a matt but am not really sure how or where to place it, or for that matter if its really necessary. Anyone knowledgeble on this? I will install culverts to allow water to flow under the driveway and finished road grade will be about 18" over existing, probably using DG over a 6" gravel base.