taem
Member
I have a very old round bale wrapper which I have run plumbed in ahead of my loader spool valves, ie between the pump and the spool valves returning to the reservoir, using the valves on the wrapper to control direction and speed. Sold that tractor and am wondering about what to do with my new situation. Should I run it from the SVC valves with lever pulled open, or some other configuration? my new tractor is a Case IH 75C with two sets of svc and a third function valve on the loader solenoid operated.
Thanks
Thanks