I installed my 3 pt adjuster bars tonight. Thanks for those that posted how much to cut to make them fit! I made some bushings, had to drill the bar out to full 1/2 inch so they would fit, then bolted 3/8 bolts through them.
It was great to use! I hooked up a new box blade by pulling the 3/8 push pins (3/8 pin with a ball at one end to help hold it in) and moving the 3 pt arms apart. Hooked up the top link and raised it.
Then walked to the rear of the blade and centered the unit, and reinstalled the push pins.... Easy, Easy, Easy!
A great way to eliminate the sway and it didn't cost too much either!
My weldable chain hooks arrived today, so will weld them to a 1/4" plate and bolt that to the bucket in two places.
Best wishes to all.
Ron, BX2200, FEL, MMM, Tiller, PHD, and box blade.
It was great to use! I hooked up a new box blade by pulling the 3/8 push pins (3/8 pin with a ball at one end to help hold it in) and moving the 3 pt arms apart. Hooked up the top link and raised it.
Then walked to the rear of the blade and centered the unit, and reinstalled the push pins.... Easy, Easy, Easy!
A great way to eliminate the sway and it didn't cost too much either!
My weldable chain hooks arrived today, so will weld them to a 1/4" plate and bolt that to the bucket in two places.
Best wishes to all.
Ron, BX2200, FEL, MMM, Tiller, PHD, and box blade.