SharpTJ
New member
I have access to some old rail track and Was thinking about using it for the frame as it痴 pretty darn heavy (55lbs/ft) and free. Not to mention the top is already a hardened work face. Combined with 2 4 grader blades.
I have a 1/2 mile gravel road to my house that will be its main purpose. And I will be pulling it with a 50hp Mahondra.
Would 8 x 4 be TOO much you think... would be around 2500lbs or so
I have a 1/2 mile gravel road to my house that will be its main purpose. And I will be pulling it with a 50hp Mahondra.
Would 8 x 4 be TOO much you think... would be around 2500lbs or so