Well I took a old drive out because it was all silt and limestone, took 6in out and put geotextial fab down. Then brought In 4 in of 57 (1-1/2. -- 1/2) limestone in and back bladed it. Well I need 4x4 to get In and out.
I need another 22ton load and don't know if it should be 57's then roll it or remove some of the new stone hope to not tear up the mat and put 304 down and pack? Found the site a little late I guess. Thanks
Drive is 24 x 120 and solid under the mat
I need another 22ton load and don't know if it should be 57's then roll it or remove some of the new stone hope to not tear up the mat and put 304 down and pack? Found the site a little late I guess. Thanks