I just got through setting 46 posts and builing a fence around my place. We used 2 sacks of quickcrete per hole and mixed it up first and poured it in the holes. I had a buddy stop by and tell me that I was doing a lot of uneccessary work. He said to put the posts in the holes, pour in dry concrete mix, then add water and it will be fine, no mixing required.
I am going to be setting 25 more posts this weekend and am contemplating doing this as it will save a lot of work, but I am not sure if it is a good idea or not?
I am going to be setting 25 more posts this weekend and am contemplating doing this as it will save a lot of work, but I am not sure if it is a good idea or not?