deere_x475guy
Gold Member
I finally got around to doing something about a stand this weekend guys and gals. I have lots of lumber left over after building the shop and home. Steel is expensive so I used it instead. Works great. The top 2x sits between the two uprights and when the PHD is hooked up and lifted you just remove the 2x and drive off. I can now hook this up alone in just a few minutes.
Links to pics here
I also put a couple of action shots of the PHD at work. I did break a shear bolt when drilling the hole for the mailbox. Some big rocks out there by the road.....
Links to pics here
I also put a couple of action shots of the PHD at work. I did break a shear bolt when drilling the hole for the mailbox. Some big rocks out there by the road.....