Arc weld
Veteran Member
I put up a pole shed last year and haven't finished the grading on the outside or put the gravel screenings in for the floor. It is kind of sloped away but we just had a big rain and I noticed the clay inside is soaking up the rain water about 2-2 1/2' inside the building on one side. Will the finish grading half way up the skirt boards stop this from happening if I drive on it and pack it good with the skid steer or is there something else to stop the inside from absorbing the water coming off the roof? Eavestroughs would be nice but were over my budget.