I tilled about half my yard (~1 acre) Friday afternoon. Spent the rest of the weekend building a toy steam shovel for the kids, now it's raining. Pretty impressed with the tiller, but naturally I could use more power. Not sure if it was the damp soil conditions or heavy root structure that was slowing me down in places. The next pass will be really easy. If I can come up with something to drag behind and smooth out the tracks, I think I'll get by with two passes. If not, I'll have to make a third pass with the rake (going backwards /forums/images/graemlins/frown.gif)
-Scott