Putting up pole barn for tractor and stuff, floor will be gravel for quite awhile before I can afford to put down concrete. I'm installing overhead doors and trying to figure out what to put at the base so they are 4" off the height of the gravel so when I do put in the concrete the doors will be at the correct height. I've been thinking about putting down a 4x4 at the right height, then grade gravel up to it on the inside and outside so it's easy to drive over. When I do the concrete I'll pull out the 4x4 and grade the gravel flat again. Any better ideas or suggestions? tnx