I've done both.
My shop is a 24 x 42 ft steel building with 12-ft walls, two 10x10 ft rollup doors, one man door, one window, 26 ga steel panels. It's on a concrete slab 6" thick, 4000 psi concrete, #4 rebar on 24" centers. Cost: $16K for the building installed by the contractor, $7K for the slab poured professionally by a contractor (in June 2005).

I built a 20 x 28 ft wood pole frame building with sloping roof (11 ft in front, 10 ft in back). The posts are set on concrete footings and are attached with Simpson post anchors. Siding and roof are 29 ga steel R-panel. Cost: materials about $4K and a month of my time (I'm old and I work slow) in 2009.

Shop-1.JPGShop-2.JPGEquip shed finished-1 (Medium).JPGEquip shed finished-1.JPG

Good luck
 

Tractor & Equipment Auctions

2004 Ford E-350 Passenger Van (A51692)
2004 Ford E-350...
Snow Plow Bracket (A47477)
Snow Plow Bracket...
Butterfly Artwork (A55758)
Butterfly Artwork...
2020 John Deere 325G Compact Track Loader Skid Steer (A55787)
2020 John Deere...
Galvanized Livestock Gates (2x Gates) (A55301)
Galvanized...
(2) TRACTOR TIRES (A54757)
(2) TRACTOR TIRES...
 
Top