I agree with all the other posters. Start at the top of the hill and work your way down.
It's also allot better to start at the end of the run and work your way to the end in one run. Makes for a cleaner dig and takes less time overall.
Before you dig, be sure you know how your going to backfill the hole again. If the trench is along a road, will you be digging on the side of it? Where will the spoils pile go? On the road or on the other side of the trench?
If you're digging along a finished road of some type, (rock, gravel, blacktop, etc ) than you might not want to pile the dirt on top of it. It's just that much more work to protect your road and risk damage to it.
Sometimes the spoil pile has to go next to the trees with no way to push the dirt back it. Then you have to pull it in with the hoe bucket. It's very time consuming, but in some situations, it's your only option.
Sometimes backfilling can be more work and effort than digging the ditch!!!
Eddie
It's also allot better to start at the end of the run and work your way to the end in one run. Makes for a cleaner dig and takes less time overall.
Before you dig, be sure you know how your going to backfill the hole again. If the trench is along a road, will you be digging on the side of it? Where will the spoils pile go? On the road or on the other side of the trench?
If you're digging along a finished road of some type, (rock, gravel, blacktop, etc ) than you might not want to pile the dirt on top of it. It's just that much more work to protect your road and risk damage to it.
Sometimes the spoil pile has to go next to the trees with no way to push the dirt back it. Then you have to pull it in with the hoe bucket. It's very time consuming, but in some situations, it's your only option.
Sometimes backfilling can be more work and effort than digging the ditch!!!
Eddie