I need to get some stone down in the back yard where I bring my truck in to dump firewood/run the splitter, etc...I also want to make a sitting area with a firepit so it all needs to be built up and covered with stone. After measuring a series of boxes I added up all the square footage to just under 2500 square feet so I rounded up to that. Average depth is going to be 4". Here is what I did:
2500 sq ft x 144 (1 square foot converted to inches) = 360,000 sq in
360,000 sq in x 4 in = 1,440,000 cu in
1,440,000 cu in / 1728 (1 cubic foot converted to inches) = 833 cu ft
833 cu ft / 27 (1 cubic yard converted to feet) = 30 cu yds
Does that look right? If so I need 30 yards of material. Then I looked up the weight per yard of DGA, which, according to a few sources is about two tons per yard, which means I need about 60 tons. What is the usual capacity of a triaxle? Will I need two deliveries?
2500 sq ft x 144 (1 square foot converted to inches) = 360,000 sq in
360,000 sq in x 4 in = 1,440,000 cu in
1,440,000 cu in / 1728 (1 cubic foot converted to inches) = 833 cu ft
833 cu ft / 27 (1 cubic yard converted to feet) = 30 cu yds
Does that look right? If so I need 30 yards of material. Then I looked up the weight per yard of DGA, which, according to a few sources is about two tons per yard, which means I need about 60 tons. What is the usual capacity of a triaxle? Will I need two deliveries?